FibreconX Macquarie Park

Mikcomm were engaged to complete a complex network construction through Macquarie Park NSW to ensure critical services were able to be commissioned for very large companies, connecting critical data centres.

 

Mikcomm had significant challenges to complete the activities such as under boring Epping Road, difficult landowners, fighting the worst rain in 100 years, constructing intricate 4 x 100mm ducts in extreme congestion and working through a global pandemic.

 

Although everything was thrown at Mikcomm through this project we completed 4km of intricate pit and pipe with zero defects at walkover, setting the benchmark for all other contractors.

This is a great place to add a tagline.

KOODIDERI RAIL

We have recently completed the Koodaideri Rail Network in the harsh conditions of the West Australian Pilbara.

 

We completed of 60 joints and fully terminated, tested and commissioned this network to world class standards including CD and PMD testing for the DWDM cores. 

We developed custom workbook and supporting documentation to detail the results in a concise yet easy to read format.

KOODAIDERI EDIT
KOODAIDERI EDIT

press to zoom
BL-CA J02-14
BL-CA J02-14

press to zoom
Patch routing in a north fobot-1
Patch routing in a north fobot-1

press to zoom
KOODAIDERI EDIT
KOODAIDERI EDIT

press to zoom
1/10
20180717_101716_ED1.jpg

OPTUS TUNCURRY

This is a great place to add a tagline.

15km of turnkey construction and installation, including:

  • 60% of directional drilling and 40% trenching through a variety of difficult ground conditions 

  • 8 joints 

  • Complex traffic management 

  • Extensive and thorough testing and commissioning 

OPTUS PALM BEACH

5G Microcell site 

  • 1500m of construction through the prestige area of palm beach

  • 4.2km of cable hauling

  • 2.5km of Telstra DCAF and breakouts

  • 4 x 5G microcell sites

  • 6 Fibre optic joints 

  • Live network cutover and interconnection back to the hub site

  • Full testing and commissioning

419fbe69-394e-440f-9b55-257e0fb4a8ac
419fbe69-394e-440f-9b55-257e0fb4a8ac

press to zoom
IMG_7045
IMG_7045

press to zoom
Palm Beach Panorama
Palm Beach Panorama

press to zoom
419fbe69-394e-440f-9b55-257e0fb4a8ac
419fbe69-394e-440f-9b55-257e0fb4a8ac

press to zoom
1/6
A19V6304
A19V6304

press to zoom
A19V6267
A19V6267

press to zoom
Photo 8-8-18, 11 07 14 am
Photo 8-8-18, 11 07 14 am

press to zoom
A19V6304
A19V6304

press to zoom
1/24

AARNET

MELBOURNE

GIRLS

GRAMMAR

This is a great place to add a tagline.

Full turnkey installation of 1.2km of fibre in high density South Yarra, including:

  • Full design modification to suit heritage and environmental concerns

  • 11 pit installations 

  • Cable hauling for 2.7km

  • 3 joints and 2 LGX

  • Extensive night works to meet completion 

OPTUS 312 CBD TO LOCKRIDGE LINK

Full turn key civil construction over 15km, including:

  • Repair and upgrade of existing networks sections

  • Interconnections with other carriers 

  • Installation of cabinet in exchange and satellite station

  • Termination of exchange fibres 

  • Bulk splicing of external 312 joints and full test and commissioning 

Perth
Perth

press to zoom
Perth
Perth

press to zoom
1/1
roy-hill2-467x270
roy-hill2-467x270

press to zoom
IMG_3436
IMG_3436

press to zoom
20150120_115747
20150120_115747

press to zoom
roy-hill2-467x270
roy-hill2-467x270

press to zoom
1/6

ROY HILL MINE

This is a great place to add a tagline.

380km of fibre splicing and commissioning, including:

  • 250 fibre optic joints 

  • 60 communication cabinets 

  • Internal fibre network design and construct in operations centres at mine and port loops

  • Chromatic Dispersion and Polarisation Mode Dispersion Testing on DWDM links

OPTUS M4 RELOCATION

Relocation project due to the widening of the Northern Road and bridge drop in Penrith M4, including:

  • Design to find best location

  • Full service and asset location using NDD

  • 3.5km of full turnkey installation

  • 1.7km of new construction

M4 Relocation
M4 Relocation

press to zoom
M4 Relocation
M4 Relocation

press to zoom
1/1
Resized_20201013_101029_ED
Resized_20201013_101029_ED

press to zoom
Resized_20201020_094201
Resized_20201020_094201

press to zoom
Resized_20201013_085416
Resized_20201013_085416

press to zoom
Resized_20201013_101029_ED
Resized_20201013_101029_ED

press to zoom
1/5

OPTUS MT WHITE AND CALGA

This is a great place to add a tagline.

New mobile sites :

  • 4.1km of construction

  • 5km of cable hauling

  • 8 splice enclosures

  • Full rock HDD

  • Redesign works to accommodate route change proposals due to environmental and community issues